Contact Us
Piper Street, Ayr - Pedestrian Crossing / Safety |
Piper Street Sidewalk Presentation from January 9, 2023 |
Piper Street Slope Stability |
Geotechnical Study Phase Reports Phase 1 Report - Installation of Guardrail on Piper Street Phase 2 Report - Erosion and Slope Stability at Piper Street Staff Reports to Council PW-09-2021 - Piper Street Slope Stability Analysis PW-33-2022 - Piper Street Slope Stability
|
2022 State of the Infrastructure - Roads |
State of Infrastructure Study - Roads 2022 |
2022 OSIM – Bridges and Major Culverts |
2022 OSIM Inspections for Municipal Bridges and Culverts |
Leisure Services Master Plan |
The Leisure Services Master Plan guides investments and priorities for leisure services in the Township between the years of 2022 and 2031. |
TransformWR - Community Climate Change Mitigation Plan |
TransformWR - Final Report (June 14, 2021) Appendix - Action Items for Township of North Dumfries Appendix - Technical Pathway (Walter Fedy) Appendix - Community Engagement Summary Report (Unless Design Partners) Appendix - Community Engagement Summary Report (formatted for screen readers) |
Townships of Waterloo Joint Service Review |
The Province of Ontario has provided funding to support the completion of the Joint Services Delivery Review under their Municipal Modernization Fund. The Service Delivery Review program is a joint undertaking involving the Townships of North Dumfries, Wellesley, Wilmot and Woolwich. The intent of the Service Delivery Review is to improve the understanding of the services currently provided by the respective Municipalities and to provide better information that will allow the Councils and Staff the opportunity to make more informed strategic choices regarding those services. Phase I of the Service Delivery Review focused on the following program areas:
The Service Delivery Review program was designed to investigate current services and their delivery approach, identify potential changes to service delivery methods and/or service levels, highlight opportunities for innovation and leveraging technology, and, recommend changes that will improve efficiency and effectiveness. |
Arena Strategy |
The Township of North Dumfries has prepared an Arena Strategy to determine current and future indoor ice needs and provision options. The study considered local demographics and growth, regional arena supplies, usage and trends, and public and stakeholder input. |
Development Charges Study |
Information about the 2020 Township Development Charges Study can be found on the Development Charges page.
|
Accessibility Reports |
An accessibility audit was preformed for all Township owned building:
For more information on accessibility, please visit the Accessibility page. |
Ayr Stormwater Management Guiding Principals |
The Study is to focus on the Urban Area of the Community of Ayr (existing and emerging), as illustrated in the Township’s Official Plan [OP]. The Township also requires an analysis through this Study on the potential urbanization of lands framing the Northumberland Street corridor, extending from Greenfield Road to Highway No. 401. The SWMGP will serve as a decision support tool, a methodology for the prioritization of works, a means to estimate future SWM requirements and costs and a transparent community process by which the Township can establish stormwater management guidelines and policies for the next ten to fifteen years. The SWMGP shall be an integrated approach that considers flood and erosion control, groundwater and surface water quality management, natural heritage environment management and infrastructure. In addition, the plan shall integrate existing policies, regulations, acts and guidelines and where appropriate develop new policies and design guidelines to aid in implementation and shall do so within a water sustainability context. In addition, the SWMGP should provide sufficient information for the Township to develop a framework for the provision of a stormwater user fee, if desired. The report will be available for review from February 1, 2022 – March 9, 2022
|
Corporate Strategic Plan |
Asset Management |
See the Asset Management page for more information. |
Energy Management |
See the Energy Management page for more information. |
Facility Condition Assessment Reports |
The 2023 Facility Condition Assessment reports are listed below. |
Facility Energy Assessments |
For more information, see the Energy Management page. |
Downtown Ayr Revitalization |
Downtown Ayr: Strategic Action Plan for Revitalization |
Greenfield Heritage Conservation District |
Greenfield Heritage Conservation District Plan Report March 2014 |
Trails & Cycling Master Plan |
Township of North Dumfries Trails Cycling Master Plan June 2014 |